• SWP3 SUMMARY

    Residential development permit applications which require a Storm Water PollutionPrevention Plan (SWP3) shall submit this SWP3 Summary in lieu of the SWP3 document
  • Property Address is the street address as listed in the development permit application.
    Legal Description is the property as listed on the County Appraisal District webpage:
    (www.traviscad.org) and the development permit application.
    **NOTE** Builders of multiple homes within the same subdivision must provide a completed SWP3
    Summary Form with each separate Development Permit application submitted

  • For SWP3 Type, select one of the three options:

    1.  A New SWP3, prepared for this project If the project is less than 5 acres, please provide the date that the project CSN was created; if the project is more than 5 acres, also provide the date when the project NOI was submitted to TCEQ.
    2. Use of an Existing SWP3 Prepared By The Same Operator If the project is less than 5 acres, please provide the date the original CSN was created and when the SWP3 was revised; if larger than 5 acres, also provide the date of the original NOI and when the NOC was submitted to TCEQ. If a small site is now designated as a large site due to the inclusion of the new acreage, please provide the date the new CSN was created and when the NOI was submitted to TCEQ.
    3. Use of an Existing SWP3 Prepared By A Different Operator If the project is smaller than 5 acres, please provide the date that the CSN was created and when SWP3 was revised; if larger than 5 acres, also provide the date the NOI was submitted to TCEQ. **NOTE**: The name and documentation of approval from the original SWP3 Primary Operator (contracts, signed agreements, etc.) must be submitted for this
      option.
  • Date CSN or NOI submitted (if starting within 30 days)Pick a Date  

    • Date of original CSN:Pick a Date  and for large sites Date of original NOI:   Pick a Date   
    • Date of SWP3 Revision:   Pick a Date   and for large sites Date NOC submitted:   Pick a Date   
    • Date of CSN posting:Pick a Date  and for large sites Date of NOI submitted:   Pick a Date   
    • Date of SWP3 Revision:   Pick a Date  Original Primary Operator:   Pick a Date   
  •  - -
  • Owner/Authorized Representative’s Contact Information

    Owner refers to the owner of the real property the proposed project is located upon, as listed in the development permit application.

  • Primary Operator 

    (A) The person or persons have operational control over a site plan, construction plan, and
    specifications, including the ability to make modifications to those plans and
    specifications; or


    (B) The person or persons have day-to-day operational control of those activities at aconstruction site that are necessary to ensure compliance with a storm water pollution
    prevention plan (SWP3) for the site or other permit conditions (e.g., they are authorized
    to direct workers at a site to carry out activities required by the SWP3 or comply with
    other permit conditions).

  • Should be Empty: